I’m trying to be prepared for anything and everything to change at the drop of a hat, because that’s what’s been happening lately concerning my understanding of legal requirements and how they differ in so many ways depending on location. “STANDARD” is a foreign word […]
So things go according to God’s plan and not my own This is something I have struggled with over the past week and a half or so as we got some of what we needed when it came to design plans, but not nearly all […]
Back in Ukraine and putting my hand to the “hoe” not the plow, but close. Sasha, Nadya and I worked out on the garden plot of Stephen’s home today clearing weeds and watering the 20 or so fruit trees, most of them having been transplanted. […]
Sasha has spent a lot of time filling out documents and paper work, sitting in offices, waiting in lines. Everything for the property ownership needs to be registered correctly so we don’t run into problems in the future. I’m very grateful that Sasha is willing […]
Finishing the front entry of the church that is now handicapped accessible Inside the church looking out at the entryway and front door Entering the church Finishing the insulation process, the outer layer of plaster that is applied. From the road
The finishing work out at the church is what’s been able to happen through these cold months. The first indoor bathroom at the church is now working. I can say this with confidence as the outhouse is no longer standing. BEFORE AFTER
Much of what has been progressing out at the property lately, doesn’t include pictures. It’s document after document that has to be filed here or there. Sasha’s spent much time going back and forth between many of the same offices as forms have to be […]
Sasha, project manager, & Rex, architect, with eMi Engineering Ministries International(eMi) out of Colorado Springs, CO is partnering with us to help in creating handicapped accessible floor plans and layouts for the rooms of Naomi’s and Stephen’s homes. Rex spent 3 days waiting in Istanbul for the […]
With the cold winter weather outside, progress has still been able to progress at the church addition inside. The bathroom is just about completely tiled, so the toilet hook up and sink installation are about all that’s left. I did have to use the out […]
It’s the holiday season here, for about another week. Ukrainian’s take their holiday’s very seriously. We did have a white Christmas here, I spent January 7th with the congregation in Darivka and Ingyletz, named after the river, Ingyletz, pictured here below. It was a great […]