The OLD

The NEW

The only small corner of the building still remaining is the out house. 
Once this small building comes down, the way for machinery to reach the PROMISE property, for Stephen’s home (in the background), will be wide and easily accessible.


below: The plan is to get the interior work completed as soon as possible, in part so the
congregation will no longer have to use an outdoor facility through these cold winter months.
These leftover bricks from bringing down the old garage (pictured above) are being used
for the interior walls of the church’s new addition, the bathroom and Sunday school classroom. 
We are preserving and conserving as possible.
Very grateful for Sasha’s (project manager) resourcefulness.

Leave a Comment