This past month of October has been busy at the site where Stephen’s home will be built. Sasha and two crews have been working hard to prepare for building by clearing the older storage buildings as well as moving the entry way into the church, as the church sits at the very front of the property. The need for this preparation is to, in the future, provide building machinery access to the back portion of the property. Up until now it’s been just a simple garden gate into the back orchard.
GARDEN GATE
Sasha’s crews are trying to get done as much as possible before winter comes. The rains have given them a bit of a set back, but they’re doing all they can to get the exterior walls and roof completed. The interior work can be completed through the coming winter.
This is the foundation for the new, indoor, handicapped accessible bathroom and classroom space for the kids at church.
The foundation now with walls on it.
At the front of the church, the new entry way is being constructed.
The foundation for the ramp and stairs is in place.
A large old tree has to be removed to allow for this expansion,
so in time we’ll have to replace it with another.