as things progress
Over the past week and half or two
much work has been happening despite the high temperatures in Darivka.
metal reinforced framework in place and then the windows
main hall window
kitchen sink window
excercise window
the utility room as more is placed and finished
The 2 meter perimeter around the house requires a finished
surface with a 2 degree grade to wash water away from the house.
A perimeter fence will serve as the waters stopping point
and also the boundary around the property.
This is the foundational hole that’s been dug for that wall,
waiting to have reinforced concrete poured.
another side of the house where the wall will be built
These are adjusted drawings of the entry gate onto the
property of PROMISE at Stephen’s house.
The metal worker, Tolic who did the garden arch and fence work,
will continue and begin making these soon.